The Cooper Road and Commerce Avenue WQARF site consists of a contaminated groundwater plume located in the vicinity of Commerce Avenue near Cooper Road in Gilbert, Arizona. The plume is bounded to the north by Encinas Street, to the south by the Neely Ranch Preserve, to the east by North Golden Key Street and to the west by Horne Street – Dish Drive.

The plume boundaries depicted on the site map represent the Arizona Department of Environmental Quality’s (ADEQ) interpretation of data available at the time the map was constructed. The map is intended to provide the public with basic information as to the estimated extent of known contamination as of the date of map production. The actual extent of contamination may be different. Therefore, the plume boundaries may change in the future as new information becomes available.


Site Status Update:

ADEQ finalized the Remedial Investigation report in June 2015. Treatment systems at the site did not operate during fiscal year 2015. ADEQ is still evaluating the need to continue to operate the soil vapor extraction/air sparge system.

Two rounds of groundwater sampling from the monitor well network were conducted in 2015. Concentrations of tetrachloroethene (PCE) continue to decline. Concentration in monitor well G-9 is relatively stable and has the highest concentration present at 29 parts per billion(ppb).

During May 2015, ADEQ installed one additional monitor well to attempt to define the northwest extent of the plume. Initial PCE concentrations measured 7 ppb, just above the Aquifer Water Quality Standard for PCE of 5.

In July 2015 ADEQ announced the availability of the Feasibility Study work plan. ADEQ is evaluating additional remediation alternatives and technologies available for the site.


Community Involvement Activities:

A community advisory board (CAB) was formed and continues to meet on a regular basis. Details of meeting agendas and minutes can be viewed at the ADEQ website. These meetings are open to the public.


Site History:

1977: Unichem (aka United Chemical Corporation) purchased the site and constructed facilities for the production of copper sulfate from scrap metal. A drywell was constructed to a depth of 79 feet on site. The drywell was located near the center of the concrete pavement that served as a foundation for the processing plant. The copper sulfate production process used aqueous ammonia, lix (a petroleum-based compound) blended with kerosene, and sulfuric acid to extract copper from the scrap metal. A diesel fired boiler with heat exchangers was used to heat the process stream before the crystallization of the copper sulfate. PCE was reportedly used to manufacture a coolant, possibly used in the crystallization process.

1983 - 1984: Unichem discontinued operations at the site prior to 1983. In July, 1983, Unichem sold the property to Aztec Resources, which operated a gold extraction plant at the site. The process reportedly used cyanide baths to extract gold from scrap materials and mine tailings. In September 1984, Aztec Resources defaulted on their payment and the property was reacquired by Unichem.

1989: There have been several phases of investigations at the Unichem Site. Operations on the eastern portion of the site, parcel 302-15-025B, were investigated by the ADEQ hazardous waste inspections unit. Several shallow soil samples were collected from the property. Samples collected from the sump of the drywell detected cyanide above the residential soil remediation level (SRL) for hydrogen cyanide of 11 milligram/kilogram (mg/kg). Arsenic, lead and copper were also present above the respective residential SRLs of 10, 400 and 2,800 mg/kg.

1990: Geraghty and Miller, Inc. collected soil samples from a depth of twelve inches at two locations on the western portion of the site, Parcel 302-15-025A. Analytical results indicated arsenic was present above the SRL. PCE and copper were also detected, but below residential SRLs. A soil vapor survey was also conducted indicating high concentrations of PCE were present in the soil vapor on the east side of this parcel at a depth of four to five feet below ground surface (bgs). A deep boring on the eastern side of this parcel detected PCE above the residential SRLs of 53 mg/kg at depths of five and 20 feet bgs. Total petroleum hydrocarbons (TPH) were also detected in the deep borings at this property which may have been related to the diesel fired boiler.

Simon-EEI Inc., collected soil samples from 24 boring on the eastern portion of the Unichem Site. No concentrations were detected above residential SRLs but quality assurance/quality control concerns exists with the VOC data because soils were collected in glass jars and volatilization of the contaminants may have occurred before analysis. PCE was detected in 11 of the borings. 1,1,1-Trichloroethane (1,1,1-TCA) was detected in five borings. TPH was detected in 14 borings. Arsenic was detected in all borings but may be at concentrations near normal background. Elevated copper concentrations were detected in boring #24, near the drywell, at depths of five and twenty feet bgs.

1994: Early in the year, cyanide contaminated soils in the area of the drywell were removed to a depth of three feet and disposed by HYDRO-SERCH, Inc. HYDRO-SEARCH, Inc. installed three groundwater monitor wells at the site. Soil samples were collected approximately every five feet until the water table was encountered at approximately 130 feet bgs. Arsenic, chromium and lead were detected above residential SRLs. No minimum groundwater protection levels (GPLs) were exceeded in the soil samples. Groundwater samples detected PCE above the Aquifer Water Quality Standard (AWQS) of 5.0 micrograms per liter (ug/l). Groundwater samples were also analyzed for cyanide, benzene, ethyl benzene, toluene, xylene and TPH but were not detected. Arsenic and barium were detected in the groundwater samples but below their AWQS.

HYDRO-SEARCH, Inc. drilled an exploratory boring to a depth of 99 feet bgs within the on-site drywell. The drywell was constructed with a sediment chamber formed with concrete rings to a depth of approximately 10 feet bgs. The drywell was apparently constructed with a drainage chamber containing gravels to a depth of 42 feet bgs. Native soils were apparently encountered at a depth of approximately 50 feet. During drilling, soil samples were collected every five to ten feet. Arsenic, chromium, TPH and mercury were detected above residential SRLs. PCE was detected above residential SRLs and the minimum GPL of 1.3 mg/kg with concentrations as high as 24,000 mg/kg. HYDRO-SEARCH, Inc. intended to conduct vapor extraction on the drywell and backfilled the boring to a depth of 50 feet bgs and installed a slotted 50 foot section of PVC screen. No vapor extraction was conducted at the site.

1996: Groundwater monitoring at the site continued and PCE was detected at concentrations as high as 6,600 mg/l in monitor Well MW-101 located north of the drywell. During monitoring, the direction of groundwater flow varied from easterly to westerly at the site.

2001: Groundwater samples collected from a Town of Gilbert monitor well (G-9) located just east of Cooper Road approximately 1,600 feet northwest of the site, detected PCE at concentrations above the AWQS. Subsequent monitoring has also detected TCE above the AWQS of 5.0 ug/l.

2002: ADEQ sampled MW-102, west of the drywell, and MW-103, south of the drywell. At this time, the upper portion of the casing of MW-101 was found to be damaged and no groundwater sample could be collected. The concentrations of PCE in groundwater samples from the two monitor wells were well above the AWQS.

2003: ADEQ installed two additional monitor wells north of monitor well G-9. MW-104S was installed just east of Cooper Road approximately 1,900 feet northwest of the site and was screened from 115 to 165 feet. This screened interval is equivalent to the other monitor wells located on the site. PCE concentrations in groundwater samples from this monitor well are usually above the AWQS. TCE concentrations have also been detected above the AWQS. MW-104D was installed at the same location and screened in a sand zone from 580 to 610 feet. This zone is equivalent to the upper screened interval in the Town of Gilbert public supply Well #15. The Town of Gilbert Well #15 is located approximately 2,800 feet northwest of the site.

2004: ADEQ conducted a preliminary investigation and placed the site on the WQARF Registry in June.  The site's Eligibility & Evaluation Score was 33 out of a possible 120.

2005: ADEQ conducted quarterly groundwater monitoring at the site. In general, concentrations of PCE in the groundwater have been lower than concentrations previously detected at the site. Groundwater samples and groundwater elevation data were collected from on-site monitor wells, ADEQ’s off-site monitor wells and monitor wells belonging to the Town of Gilbert. Groundwater flow direction was difficult to determine based on the groundwater elevation data collected. Surface elevations of all wells were resurveyed in August and significant elevation differences were noted in the on-site and Town of Gilbert monitor wells. In September, PCE was detected for the first time in MW-104D at a concentration of 0.59 ug/l.


Drilling Rig Installing a Monitor Well

2006: ADEQ completed an Early Response Action (ERA) evaluation at the site. During this ERA evaluation, ADEQ investigated the depth of groundwater contamination at the site and installed an extraction well (EW-101) located northwest of the drywell. ADEQ determined the concentrations of PCE in the soil and soil vapor at the site and installed several soil vapor monitor wells, SVE wells, and groundwater air sparge wells. ADEQ also collected and analyzed additional shallow soil samples to begin to define the extent of surface soil contamination indicated by previous samples collected. The results of the ERA evaluation at the site indicated the need to move forward with the ERA. Soil and soil vapor data detected PCE above the minimum GPL and residential SRLs. The ERA evaluation report provided by ADEQ's contractor, Hydro Geo Chem, recommended treating the unsaturated zone contamination through SVE combined with air sparge to remediate groundwater. The report also recommended groundwater extraction to control off-site migration of groundwater.

ADEQ also installed Well MW-105 located 600 feet to the northeast and Well MW-106 located 1,200 feet west of the site. Analytical results from MW-105 and MW-106 indicated the extent of the groundwater contamination plume had not been defined because PCE concentrations in these new wells were above the AWQS. In August, PCE was detected again in MW-104D. The concentration detected was 0.44 ug/l.

2007: In May, ADEQ installed three groundwater monitor wells off-site to continue to determine the extent of the plume. In August, ADEQ conducted an SVE pilot test to determine unsaturated zone properties. Based on the information gathered during the SVE pilot test, ADEQ and their contractor, Hydro Geo Chem, began designing the SVE system.

During September, ADEQ conducted an aquifer test on EW-101. Based on the data gathered during the aquifer test for the extraction well, EW-101, ADEQ and Hydro Geo Chem began designing the groundwater pump and treat system.

2008:In February, ADEQ installed three additional monitor wells off-site to continue to determine the extent of the plume. Concentrations of PCE in these wells indicated the groundwater contamination plume extends north of Guadalupe Road.

In April, ADEQ began construction of the SVE, groundwater pump, and treat systems. Construction of the treatment system compound was completed in July. The Maricopa County Air Permit required to operate the SVE treatment system was received in July. The new transformer was installed in November. Initial startup of the SVE system occurred on December 22nd.

ADEQ worked on finalizing the construction design for the conveyance of treated groundwater to the Salt River Project lateral south of the site and the Town of Gilbert wastewater treatment plant to the east of the site. The Arizona Pollutant Discharge Elimination System (AZPDES) permit, required to discharge to a water of the United States, was granted on November 18th.

2009: Initial start-up of the AS system occurred on May 6th. During the first year of operation, approximately 3,190 pounds of PCE and TCE were recovered.

The Town of Gilbert approved ADEQ's plans to discharge treated groundwater to the water treatment plant located immediately east of the site. SRP and ADEQ finalized the agreement for construction in the SRP right of way and to discharge to the canal south of the site. Once access is obtained, ADEQ will complete the conveyance to discharge treated groundwater to the SRP canal.

2010: In July, ADEQ completed construction of the treated groundwater conveyances to the Town of Gilbert sanitary sewer system and the Salt River Project's lateral 9.5 located directly south of the site.  Initial startup of the groundwater pump and treat system began on August 2nd, and continuous automated operations began on August 25th.  During the first four months of operation, the pump and treat system has pumped and treated approximately 16,802,000 gallons of groundwater and removed approximately 12 pounds of PCE.

In November, ADEQ installed an additional soil vapor extraction well where previous sampling indicated a likely surface spill of PCE had occurred. Approximately 750 pounds of PCE and TCE were recovered during the year.

Groundwater monitoring of wells near the extraction well was conducted to determine the effectiveness of the pump and treat system.  Results of this monitoring are expected in early 2011. In addition, the entire monitor well network at the site was sampled twice this year to monitor the extent of the plume.

2011: The pump and treat system operated normally and the system treated 36 million gallons of groundwater and recovered over 30 pounds of VOCs.

ADEQ continued to operate and maintain the SVE/AS system. The system has recovered over 246 pounds of PCE and TCE.

ADEQ contractor, Hydro Geo Chem, Inc. completed an evaluation of the capture zone of extraction well EW-101 during the first quarter.  The evaluation indicates a capture zone of approximately 300 feet wide and encompasses the source area at the location of the drywell.

2012: In June 2012, ADEQ drilled and sampled three borings in the immediate vicinity of the main source area, the former drywell. The current SVE well located in the drywell was installed in 1994 by the responsible party at the time.  Vapor extraction was not conducted at the site until ADEQ began extracting in 2008.  The original SVE well was installed to a depth of 50 feet but during pilot testing of the SVE system, it was noted that this vapor extraction well was back-filled with sediment to a depth of 38 feet.

The original drywell depth was approximately 80 feet. Soil samples collected during the exploratory boring at the drywell in 1994 detected PCE at concentrations ranging from 800 to 24,000 mg/kg at depths from 40 to 70 feet with the highest concentration in the soil sample collected at 70 feet. 

The sample results indicated significant amounts of PCE were still present in the soils near the drywell.  In the boring closest to the drywell, PCE was detected at a concentration of 170 mg/kg at 60 feet and 4,800 mg/kg at 70 feet.  A sample collected from 30 feet in the same boring had blue-green discoloration and detected copper at a concentration of 15,000 mg/kg, well above the minimum GPL of 7,600 mg/kg.  ADEQ installed two additional SVE wells in these borings, SVE-106 and SVE -107.

During 2012 the pump and treat system operated normally and has treated 96,778,051 gallons of groundwater and recovered more than 37 pounds of VOCs. ADEQ continued to operate and maintain the SVE/AS system. Since startup in Dec. 2008 the system has recovered more than 4450 pounds of PCE and TCE.

ADEQ continues to conduct groundwater monitoring of wells near the extraction well on a quarterly basis to monitor the effectiveness of the pump and treat system.  In addition, the entire monitor well network was sampled twice to monitor the extent of the plume.

2013: ADEQ continues to operate the SVE/AS and groundwater pump and treat systems. During 2013 the pump and treat system treated 55,033,289 gallons of water, and since startup in 2010 has recovered more than 39 pounds of VOCs. Since startup in December 2008 the SVE/AS system has recovered more than 4,621 pounds of PCE and TCE.

ADEQ continues to conduct groundwater monitoring of wells near the extraction well on a quarterly basis to monitor the effectiveness of the pump and treat system. In addition, the entire monitor well network at the site is sampled twice a year to monitor the extent of the plume.

In 2013 ADEQ installed five additional shallow monitor wells near the center and in the southwest area of the groundwater plume. ADEQ also installed an additional deep monitor well, MW-119D, near SRP well 29E-1.5S located at the SRP canal and Cooper road. Initial samples from MW-119D detected PCE at concentrations at or above the AWQS. Concentrations of PCE ranged from 4.2 to 7.2 ug/L. SRP well 29E-1.5S is open to both the upper and deeper aquifer and may be providing a conduit for contamination in the upper portion of the aquifer to migrate to the deeper aquifer.

2014: ADEQ continues to conduct groundwater monitoring of wells near the extraction well on a quarterly basis to monitor the effectiveness of the pump and treat system. In addition, the entire monitor well network at the site is sampled twice a year to monitor the extent of the plume.

The groundwater pump and treat system was shut down in September 2014 to evaluate the need for continued operation. During operation from 2010 to 2014, the system treated over 193,000,000 gallons of water, and recovered over 40 pounds of volatile organic compounds.

Also in June 2014, the soil vapor extraction/air sparge system was shut down to evaluate the need for continued operation. Since startup in December 2008, the soil vapor extraction/air sparge system has recovered over 4,650 pounds of PCE and TCE.

Groundwater samples collected in November 2013 through July 2014 from MW-119D detected PCE at a concentrations ranging from 4.2 to 7.3 micrograms per liter (µg/L), near the AWQS for PCE of 5.0 µg/L. Samples collected since December 2014 have not detected PCE above the AWQS.

2015: ADEQ finalized the Remedial Investigation report in June 2015 and in July 2015 ADEQ announced the availability of the Feasibility Study work plan. ADEQ is evaluating additional remediation alternatives and technologies available for the site. Quarterly groundwater monitoring continues at the site.


Contaminants:

The current contaminants of concern in the groundwater at the site include PCE and TCE. Contaminants of concern in the soils at the site include PCE, arsenic and copper. Contaminants of concern at the site may change as new data become available.


Public Health Impact:

No irrigation, drinking water or other production wells have been impacted by the VOC contamination from the site. However, PCE and TCE are present in the groundwater monitor wells at or near the site at concentrations above the AWQS.


Site Hydrogeology:

The site is located within the eastern Salt River Valley (SRV) Sub-Basin. The eastern SRV is comprised of basin-fill deposits overlain by stream alluvium (sand and gravel). Basin-fill deposits have been subdivided into upper and lower basin-fill.

The upper basin-fill is generally composed of unconsolidated to moderately consolidated alluvial deposits, grading to finer grained deposits towards the basin interior. The upper basin-fill may be as thick as 1,000 feet in the eastern SRV. Stream alluvium has been deposited by the ancestral Salt River drainage system and consists primarily of coarse unconsolidated deposits. Additionally, finer-grained flood plain deposits may be associated with the stream alluvium.

Based on monitor wells drilled near the site, it appears the stream alluvium is present to 270 feet bgs. Finer grained sediments of the upper basin-fill are present to a depth of at least 750 bgs. Depth to groundwater is approximately 130 feet. In the area of the site the direction of groundwater flow is usually to the west-northwest.


Contacts:

Name Phone/Fax E-mail
Scott Goodwin, ADEQ Project Manager (602) 771-4452*/(602) 771-4138 fax [email protected]
Wendy Flood, ADEQ Community Involvement Coordinator (602) 771-4410*/(602) 771-4236 fax [email protected]

*In Arizona, but outside the Phoenix area, call toll-free at (800) 234-5677.


Online Information Repository:

Interested parties can review site information here on this page and at the ADEQ Record Center located at 1110 W. Washington Street, Phoenix, Arizona. Please contact (602) 771-4380 or (800) 234-5677 ext. 6027714380 for hours of operation and to schedule an appointment. To review site information at a location near you, please contact the designated Community Involvement Coordinator.

CAB Meeting Agendas and Minutes

Public Notice: Availability of WQARF Final Remedial Investigation Report

Site Map

Registry Report

Remedial Investigation/Feasibility Study Outline

Feasability Study Work Plan

Remedial Investigation Report

Operations and Maintenance Manual

30-Day Public Comment Period Proposed Remedial Objectives (RO) Report